• 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
  • 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
  • 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
  • 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
  • 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
  • 300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

After-sales Service: Provide
Warranty: 1 Year
Certification: CE, ISO 9001:2000
Samples:
US$ 156000/Piece 1 Piece(Min.Order)
| Order Sample
1
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig pictures & photos
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
US $15,000-200,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2022

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory, Trading Company
  • Overview
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
PDT-300
Condition
New
Motor
AC Motor
Drill Hole Diameter
>300mm
Drill Hole Depth
>200m
Bit Type
Customizable
Drilling Way
Rotary
Type
Four-Wheel trailer
Name
Water Well Drill Rig
L*W*H
12500*2480*3700mm
Weight
20000 Kg
Feature
Portable, High Drilling Efficiency
Key Words
Drilliing Rig
Color
Orange/Yellow
Usage
Water Well, Water Well Drilling
Transport Package
Carton or Wooden Box
Specification
8HP, 25HP, 35HP
Trademark
pearldrill
Origin
China
HS Code
8430412900
Production Capacity
5000pieces/Year

Packaging & Delivery

Package Size
1250.00cm * 248.00cm * 370.00cm
Package Gross Weight
20000.000kg
Lead Time
15 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

300M Hydraulic Trailer Truck Mounted Water Well Drilling Rig
 

Overview

 

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig




 
Product Description

Our truck-mounted water well drilling rig is a customized product that customers can customize according to their actual needs. Customers can choose from: chassis brand, boom length, mud pump selection, chassis installation air compressor and so on. The vehicle-mounted water well drilling rig is divided into different models according to the drilling depth, the maximum depth can reach 1500 meters. Truck Mounted Mobile Water Well Drilling Rig is widely used in the geological general investigation and exploration, road, railway, port, bridge, water conservancy, tunnel and tall building basic exploration, kinds of hole in concrete structure, river, levees, subgrade grouting hole drilling and direct grouting, civil wells and earth central air conditioner, and etc.Drilling rig is equipped with a hydraulic lift tower and four hydraulic legs, convenient and safe operation, reducing labor time and intensity.



 

Product Parameters
 
Model
PDT-300
The weight (T)
22
The hole diameter (mm)
140-273
Drilling depth (m)
300
One-time advance length (m)
3.3
Walking speed (km/h)
80
Using air pressure (Mpa)
2.5
Air consumption (m³/min)
31
Drill pipe diameter (mm)
89
Drill pipe length (m)
3
Rig lifting force (T)
18
Swing speed(rpm)
40-70
Swing torque (N.m)
5700-7500
Automobile engine power (KW)
191
Driving form
6×4
Steering wheel
Right
Overall dimensions (mm)
11500×2500×3400


 

 

Detailed Photos


300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig


Instruction Manual for New Hydraulic Drilling Rig
Thank you for choosing to use our hydraulic drilling rigs, and I hope you can give us better feedback.
. Installation and debugging
1. First check whether the drilling rig equipment and tools are in good condition.
2. First add 30-40 catties of hydraulic oil, gasoline engine should add 95 gasoline, gasoline engine oil should be replaced in time.
3. When lifting, do not lift the drilling rig too high, and it is forbidden to stand or work below.
4. Please read the instruction manual and perform the actual drilling work after the operation is proficient.
. Matters needing attention
1. During the actual drilling, first find the position of the wellhead, and level the position where the machine is placed to avoid shaking.
2 Stand up the folded part of the drilling rig and fasten the fixing point screws.
3. Connect one end of the high-pressure water pipe to the water inlet of the main engine, and the other end to the water outlet of the pump, and tighten it with iron wire.
4. Dig a reservoir next to the well drilling machine, put the water inlet of the pump directly in the pool, and use circulating water when working.
5. When drilling, the safety cover is opened, the drill bit and the drill pipe are connected to the main engine, and the wire rope is kept in a slack state. No matter whether each rod is drilled to the bottom, the main engine part falls to the bottom. When changing the rod, lift it up again and close the safety cover. Well, let the joint head be 5 cm above the safety cover, and rewind the wire at this position.
6. When drilling down two to three drill pipes, make sure whether the water pump is blocked by mud, and keep the water pump running smoothly, so as not to block the drill bit or the mud can not rush up, causing difficulty in lifting the rod.
7. During drilling, if it is necessary to rewind the wire, first stop the reversing switch to the middle position, and wait until the speed of the drilling rig stops before rewinding the wire.
8. In the process of transportation, it can be installed separately, be careful not to damage the parts, and not to be exposed to rain or water.
. Mastering the water layer
When the drilling rig is about to drill to the required depth, it should be noted that the water is washed with large grains of sand or mud, like water-white mud eggs, irregularly rounded and somewhat smooth, all of which are water layers. so far.
.Equipment maintenance
Whether the gear box of the drilling rig and the reduction box of the lifting rod are short of oil, every time the well is drilled and completed, the water pump, drill bit and joint head should be flushed, and the joint head, V-belt, wire rope, etc. should be checked frequently for damage or replaced in time. We are not responsible for any accident caused by improper operation, please use it carefully. Please contact us if you have any details.





300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

 
-COMPANY BRIEF-
We provide high-quality and complete drilling equipment including drilling rigs, drilling tools, mud pumps, DTH drilling tools, rock drilling tools, etc. They are widely used in water wells, farmland irrigation, geological exploration, small pile holes, geothermal, rope coring, Mining etc. Our products are the products of choice for drilling engineers in many countries due to their precise design and efficient drilling in use.

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

Why choose China Hunan Guangzhou Technology Co., Ltd.?

1. Our suggestion is to provide users with the most suitable drilling machine.
You can get a full range of product selection advice and product customization without paying any fees.

2. We have two groups of special design teams. A team of after-sales engineers with more than 30 years of construction experience at home and abroad, and a team of designers who graduated from well-known universities and have rich work experience. We will combine rich practical construction experience with the most advanced professional theoretical knowledge to meet your various needs.

3. We are not only familiar with drilling rigs, but also familiar with the human environment, construction environment and strata in the construction field at home and abroad. Provide you with the greatest technical support, save costs, and create the greatest value with you. Yes, choosing us is your best decision.

4. Support overseas training and maintenance. After you purchase our machine, we provide ten days of overseas training for free.

5. One year warranty. pearldrill understands the diverse needs of water well service companies and operators worldwide.
Customers who purchase rigs from us can save a lot of money, thereby increasing their profits.
FACTORY  SHOW
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig


300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

 


300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
 
 

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

 

-APPLICATION RANGE-

Apply to:Water Well Drilling/civil engineering and infrastructure/for rock core drilling/geological coring exploration/Soil Testing and sampling /geophysical survey/mineral exploration and other industries.

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

 

-PAYMENT-

DIY customization: please provide your rock formation information or detailed size drawings.

Free samples: some samples can be provided free of charge.

Trading:EXW, FOB, CFR, CIF, DDU such as.

Payment:T/T L/C,D/A,D/P,Western Union,MoneyGram.

Delivery time: normally 7-12 days

 

 

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
 

-DELIVERY-

Delivery: there are four main delivery channels including air, sea, express and road transportation, which can be selected according to customers' different requirements.

Air freight logistics:DHL/UPS/EMS/TNT/ FEDEX,etc.

-PACKAGING STYLE-

300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig

 

-EDLIVERY-

 
300m Hydraulic Trailer Truck Mounted Water Well Drilling Rig
 

-AFTER-SALES SERVICE-

Dear User:

Welcome you to choose and use our products correctly!

The geological drill bit produced by our company has a 6-month warranty period.In case of abnormal scrap such as sheet falling, steel body cracking, lamination of composite sheet, etc., the company may make compensation if the situation is confirmed by the quality department of the company.

If it is one of the phenomena listed in the following table, it shall be deemed as normal scrapping, and the company shall not compensate for it:

1.Drop: Wear no more than 10%, send back for replacement, wear no more than 50%, depending on the situation, steel body cracking: wear no more than 30%, send back for replacement; Wear more than 50%, such as artificial improper crack, do not change.

2.Wrong size or thread: New back for new.

3.Weak solder joints, broken wing pieces, etc. : wear not more than 20%, send back for a new; Wear more than 50%, such as artificial improper operation, do not change.

4.The problem of lamination of composite slices: It depends.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now