800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

Product Details
Customization: Available
After-sales Service: Provide
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (10)
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
  • 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
Find Similar Products
  • Overview
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
PDT-800
Certification
CE, ISO 9001:2000
Condition
New
Motor
AC Motor
Drill Hole Diameter
>300mm
Drill Hole Depth
800m
Bit Type
Customizable
Drilling Way
Rotary
Type
Four-Wheel trailer
Name
Water Well Drillring Rig
L*W*H
8050X2400X3300mm
Weight
15t
Feature
Portable, High Drilling Efficiency
Key Words
Drilliing Rig
Color
Orange/Yellow
Usage
Water Well, Water Well Drilling
Transport Package
Carton or Wooden Box
Specification
800m water well drilling rig
Trademark
pearldrill
Origin
China
HS Code
8430412900
Production Capacity
50000pieces/Year

Packaging & Delivery

Package Size
8050.00cm * 2400.00cm * 3300.00cm
Package Gross Weight
15000.000kg
Lead Time
20 days (1 - 1 Pieces)
To be negotiated ( > 1 Pieces)

Product Description

 800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

Overview

 

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor





 
Product Description

The truck-mounted rig is divided into different models according to the drilling depth, the maximum depth can reach 1500 meters. Truck Mounted Mobile Water Well Drilling Rig is widely used in the geological general investigation and exploration, road, railway, port, bridge, water conservancy, tunnel and tall building basic exploration, kinds of holes in concrete structure, river, levees, subgrade grouting hole drilling and direct grouting, civil wells and earth central air conditioner, and etc. The drilling rig is equipped with a hydraulic lift tower and four hydraulic legs, convenient and safe operation, reducing labor time and intensity.



 

Product Parameters
 
Applicable Industries Water Well Drilling , Energy & Mining, Construction works 
Model PDT800
Desc. Water Well Truck Mounted Rig
Drilling Diameter 115mm-650mm
Drilling Depth 800m
Power Type Diesel
Dimension(L*W*H) 8050*2400*3300mm
Drilling diameter 115-650mm
Drilling rod diameter 102mm/108mm/114mm
Drilling rod length 2.0m, 3.0m; 4.5m, 6.0m
One-time propulsion length 6600mm
Working speed 100Km/h
Minimum distance between ground 1.7M
Working Pressure 1.7-3.5Mpa
Host Power 132KW  Engine
Lifting force 30T
Hosting force of winch 2T
Lifting speed 3.0m/min
Air consumption 17-42 m3/min
Rotary torque 8500-17000 N.M
Swing speed 80-145rpm
Width of loading 2.95m
Rapid rise speed 20m/min
Rapid drilling speed 40m/min
Drilling footage efficiency 15-35m/h
Weight 15000 KG


 

Product Features:
1.Light weight, energy saving
2.Unique design and simple drilling structure
3.Easy to transport and can learn how to handle the machine in short time
4.Can drill through hard stratum
5. Offer best after-sales service with techincal support 
6.One person operation, reduce the labor intensity
7.High efficiency and work fast

What we offer:

1) Good quality control
2) very competitive price
3) State-of-the-art technology products
4) Leading domestic drilling rig sales, domestic large drilling rig manufacturers

 

Detailed Photos


800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor


Instruction Manual for New Hydraulic Drilling Rig
Thank you for choosing to use our hydraulic drilling rigs, and I hope you can give us better feedback.
. Installation and debugging
1. First check whether the drilling rig equipment and tools are in good condition.
2. First add 30-40 catties of hydraulic oil, gasoline engine should add 95 gasoline, gasoline engine oil should be replaced in time.
3. When lifting, do not lift the drilling rig too high, and it is forbidden to stand or work below.
4. Please read the instruction manual and perform the actual drilling work after the operation is proficient.
. Matters needing attention
1. During the actual drilling, first find the position of the wellhead, and level the position where the machine is placed to avoid shaking.
2 Stand up the folded part of the drilling rig and fasten the fixing point screws.
3. Connect one end of the high-pressure water pipe to the water inlet of the main engine, and the other end to the water outlet of the pump, and tighten it with iron wire.
4. Dig a reservoir next to the well drilling machine, put the water inlet of the pump directly in the pool, and use circulating water when working.
5. When drilling, the safety cover is opened, the drill bit and the drill pipe are connected to the main engine, and the wire rope is kept in a slack state. No matter whether each rod is drilled to the bottom, the main engine part falls to the bottom. When changing the rod, lift it up again and close the safety cover. Well, let the joint head be 5 cm above the safety cover, and rewind the wire at this position.
6. When drilling down two to three drill pipes, make sure whether the water pump is blocked by mud, and keep the water pump running smoothly, so as not to block the drill bit or the mud can not rush up, causing difficulty in lifting the rod.
7. During drilling, if it is necessary to rewind the wire, first stop the reversing switch to the middle position, and wait until the speed of the drilling rig stops before rewinding the wire.
8. In the process of transportation, it can be installed separately, be careful not to damage the parts, and not to be exposed to rain or water.
. Mastering the water layer
When the drilling rig is about to drill to the required depth, it should be noted that the water is washed with large grains of sand or mud, like water-white mud eggs, irregularly rounded and somewhat smooth, all of which are water layers. so far.
.Equipment maintenance
Whether the gear box of the drilling rig and the reduction box of the lifting rod are short of oil, every time the well is drilled and completed, the water pump, drill bit and joint head should be flushed, and the joint head, V-belt, wire rope, etc. should be checked frequently for damage or replaced in time. We are not responsible for any accident caused by improper operation, please use it carefully. Please contact us if you have any details.





800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

 
-COMPANY BRIEF-
We provide high-quality and complete drilling equipment including drilling rigs, drilling tools, mud pumps, DTH drilling tools, rock drilling tools, etc. They are widely used in water wells, farmland irrigation, geological exploration, small pile holes, geothermal, rope coring, Mining etc. Our products are the products of choice for drilling engineers in many countries due to their precise design and efficient drilling in use.

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

Why choose China Hunan Guangzhou Technology Co., Ltd.?

1. Our suggestion is to provide users with the most suitable drilling machine.
You can get a full range of product selection advice and product customization without paying any fees.

2. We have two groups of special design teams. A team of after-sales engineers with more than 30 years of construction experience at home and abroad, and a team of designers who graduated from well-known universities and have rich work experience. We will combine rich practical construction experience with the most advanced professional theoretical knowledge to meet your various needs.

3. We are not only familiar with drilling rigs, but also familiar with the human environment, construction environment and strata in the construction field at home and abroad. Provide you with the greatest technical support, save costs, and create the greatest value with you. Yes, choosing us is your best decision.

4. Support overseas training and maintenance. After you purchase our machine, we provide ten days of overseas training for free.

5. One year warranty. pearldrill understands the diverse needs of water well service companies and operators worldwide.
Customers who purchase rigs from us can save a lot of money, thereby increasing their profits.
FACTORY  SHOW
800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor


800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

 


800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
 
 

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

 

-APPLICATION RANGE-

Apply to:Water Well Drilling/civil engineering and infrastructure/for rock core drilling/geological coring exploration/Soil Testing and sampling /geophysical survey/mineral exploration and other industries.

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

 

-PAYMENT-

DIY customization: please provide your rock formation information or detailed size drawings.

Free samples: some samples can be provided free of charge.

Trading:EXW, FOB, CFR, CIF, DDU such as.

Payment:T/T L/C,D/A,D/P,Western Union,MoneyGram.

Delivery time: normally 7-12 days

 

 

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
 

-DELIVERY-

Delivery: there are four main delivery channels including air, sea, express and road transportation, which can be selected according to customers' different requirements.

Air freight logistics:DHL/UPS/EMS/TNT/ FEDEX,etc.

-PACKAGING STYLE-

800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor

 

-EDLIVERY-

 
800m Truck Mounted Rig Water Well Drilling Rig with Air Compressor
 

-AFTER-SALES SERVICE-

Dear User:

Welcome you to choose and use our products correctly!

The geological drill bit produced by our company has a 6-month warranty period.In case of abnormal scrap such as sheet falling, steel body cracking, lamination of composite sheet, etc., the company may make compensation if the situation is confirmed by the quality department of the company.

If it is one of the phenomena listed in the following table, it shall be deemed as normal scrapping, and the company shall not compensate for it:

1.Drop: Wear no more than 10%, send back for replacement, wear no more than 50%, depending on the situation, steel body cracking: wear no more than 30%, send back for replacement; Wear more than 50%, such as artificial improper crack, do not change.

2.Wrong size or thread: New back for new.

3.Weak solder joints, broken wing pieces, etc. : wear not more than 20%, send back for a new; Wear more than 50%, such as artificial improper operation, do not change.

4.The problem of lamination of composite slices: It depends.

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now