Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 65000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our truck-mounted water well drilling rig is a customized product that customers can customize according to their actual needs. Customers can choose from: chassis brand, boom length, mud pump selection, chassis installation air compressor and so on. The vehicle-mounted water well drilling rig is divided into different models according to the drilling depth, the maximum depth can reach 1500 meters. Truck Mounted Mobile Water Well Drilling Rig is widely used in the geological general investigation and exploration, road, railway, port, bridge, water conservancy, tunnel and tall building basic exploration, kinds of hole in concrete structure, river, levees, subgrade grouting hole drilling and direct grouting, civil wells and earth central air conditioner, and etc.Drilling rig is equipped with a hydraulic lift tower and four hydraulic legs, convenient and safe operation, reducing labor time and intensity.
Instruction Manual for New Hydraulic Drilling Rig
Thank you for choosing to use our hydraulic drilling rigs, and I hope you can give us better feedback.
. Installation and debugging
1. First check whether the drilling rig equipment and tools are in good condition.
2. First add 30-40 catties of hydraulic oil, gasoline engine should add 95 gasoline, gasoline engine oil should be replaced in time.
3. When lifting, do not lift the drilling rig too high, and it is forbidden to stand or work below.
4. Please read the instruction manual and perform the actual drilling work after the operation is proficient.
. Matters needing attention
1. During the actual drilling, first find the position of the wellhead, and level the position where the machine is placed to avoid shaking.
2 Stand up the folded part of the drilling rig and fasten the fixing point screws.
3. Connect one end of the high-pressure water pipe to the water inlet of the main engine, and the other end to the water outlet of the pump, and tighten it with iron wire.
4. Dig a reservoir next to the well drilling machine, put the water inlet of the pump directly in the pool, and use circulating water when working.
5. When drilling, the safety cover is opened, the drill bit and the drill pipe are connected to the main engine, and the wire rope is kept in a slack state. No matter whether each rod is drilled to the bottom, the main engine part falls to the bottom. When changing the rod, lift it up again and close the safety cover. Well, let the joint head be 5 cm above the safety cover, and rewind the wire at this position.
6. When drilling down two to three drill pipes, make sure whether the water pump is blocked by mud, and keep the water pump running smoothly, so as not to block the drill bit or the mud can not rush up, causing difficulty in lifting the rod.
7. During drilling, if it is necessary to rewind the wire, first stop the reversing switch to the middle position, and wait until the speed of the drilling rig stops before rewinding the wire.
8. In the process of transportation, it can be installed separately, be careful not to damage the parts, and not to be exposed to rain or water.
. Mastering the water layer
When the drilling rig is about to drill to the required depth, it should be noted that the water is washed with large grains of sand or mud, like water-white mud eggs, irregularly rounded and somewhat smooth, all of which are water layers. so far.
.Equipment maintenance
Whether the gear box of the drilling rig and the reduction box of the lifting rod are short of oil, every time the well is drilled and completed, the water pump, drill bit and joint head should be flushed, and the joint head, V-belt, wire rope, etc. should be checked frequently for damage or replaced in time. We are not responsible for any accident caused by improper operation, please use it carefully. Please contact us if you have any details.
-APPLICATION RANGE-
Apply to:Water Well Drilling/civil engineering and infrastructure/for rock core drilling/geological coring exploration/Soil Testing and sampling /geophysical survey/mineral exploration and other industries.
-PAYMENT-
DIY customization: please provide your rock formation information or detailed size drawings.
Free samples: some samples can be provided free of charge.
Trading:EXW, FOB, CFR, CIF, DDU such as.
Payment:T/T L/C,D/A,D/P,Western Union,MoneyGram.
Delivery time: normally 7-12 days
Delivery: there are four main delivery channels including air, sea, express and road transportation, which can be selected according to customers' different requirements.
Air freight logistics:DHL/UPS/EMS/TNT/ FEDEX,etc.
Dear User:
Welcome you to choose and use our products correctly!
The geological drill bit produced by our company has a 6-month warranty period.In case of abnormal scrap such as sheet falling, steel body cracking, lamination of composite sheet, etc., the company may make compensation if the situation is confirmed by the quality department of the company.
If it is one of the phenomena listed in the following table, it shall be deemed as normal scrapping, and the company shall not compensate for it:
1.Drop: Wear no more than 10%, send back for replacement, wear no more than 50%, depending on the situation, steel body cracking: wear no more than 30%, send back for replacement; Wear more than 50%, such as artificial improper crack, do not change.
2.Wrong size or thread: New back for new.
3.Weak solder joints, broken wing pieces, etc. : wear not more than 20%, send back for a new; Wear more than 50%, such as artificial improper operation, do not change.
4.The problem of lamination of composite slices: It depends.