300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig

Product Details
Customization: Available
After-sales Service: Provide
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (10)
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
  • 300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
Find Similar Products
  • Overview
  • Product Parameters
  • Detailed Photos
Overview

Basic Info.

Model NO.
PD-XQ300B
Certification
CE, ISO 9001:2000
Condition
New
Motor
AC Motor
Drill Hole Diameter
105-273mm
Drill Hole Depth
300m
Bit Type
PDC Bits,Alloy Bit
Drilling Way
Rotary
Type
Wheels
Name
Waterwell Drilling Rig
Drilling Rod Length
3m
Weight
7.5 T
Feature
Portable, High Drilling Efficiency
Transport Package
Wooden
Specification
PD-XQ300B
Trademark
Pearldrill
Origin
China
HS Code
8430419000
Production Capacity
5000pieces/Year

Packaging & Delivery

Package Size
240.00cm * 135.00cm * 200.00cm
Package Gross Weight
5500.000kg

Product Description

300m Borehole Drilling Diesel Crawler Hydraulic WaterWell Drilling Rig

 

XQ300B series waterwell drilling rig adopts multi-functional full hydraulic control, and the overhead power head drives the rotation, with high drilling efficiency. The whole machine has compact layout and small size, which can meet the requirements of well drilling and culvert transportation. The drill is equipped with a 90 kW engine and a 50 / 50 / 25 gear hydraulic oil pump. The main engine adopts crawler self-propelled type, tm09 traveling motor and excavator are equipped with four wheels. It has good mobility and is convenient for construction in complex terrain in cities and mountainous areas. The hydraulic system adopts variable system. The compound telescopic sliding frame of the drilling rig greatly reduces the labor intensity and improves the construction efficiency and project quality.

It is widely used in drilling ground source air conditioning holes, water wells, testing wells, dewatering wells, rescue wells and other engineering projects.

 

300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig

 

 

Product Parameters
 
Model NO. PD-XQ300B
Desc. Hydraulic waterwell drilling rig / Diesel waterwell drilling rig
Motor AC Motor
Borehole Diameter 105-273 mm
Max Drill Hole Depth 300m
Working wind pressure 1.2 - 3.5 MPa
Drilling Rod Length 3 M
Drilling Rod Dia 76mm / 89mm
Axial Force  5T
Lift Force 16T
Power Head Stroke 3.6 M
Max. Rotation Torque 6500 Nm
Max Rotation Speed 100 r / min
Winch lifting force  2T
Jacks Stroke 1.3 M
Moving Speed 2.5 Km/h
Uphill angle 21°
Weight 5.5T
Motor YuChai 90 KW
Pump 50-50-25 hydraulic oil pump
Outsize 2.4 x1.35 x 2 M
Working Condition Loose Layer Bedrock
Drilling Method:  Hydraulic Rotary, Downhole Hammer or Mud Drilling



 
Detailed Photos

 


300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig


300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig



Instruction Manual for New Diesel Crawler Hydraulic Waterwell Drilling Rig
Thank you for choosing to use our hydraulic drilling rigs, and I hope you can give us better feedback.
. Installation and debugging
1. First check whether the drilling rig equipment and tools are in good condition.
2. First add 30-40 catties of hydraulic oil, gasoline engine should add 95 gasoline, gasoline engine oil should be replaced in time.
3. When lifting, do not lift the drilling rig too high, and it is forbidden to stand or work below.
4. Please read the instruction manual and perform the actual drilling work after the operation is proficient.
. Matters needing attention
1. During the actual drilling, first find the position of the wellhead, and level the position where the machine is placed to avoid shaking.
2 Stand up the folded part of the drilling rig and fasten the fixing point screws.
3. Connect one end of the high-pressure water pipe to the water inlet of the main engine, and the other end to the water outlet of the pump, and tighten it with iron wire.
4. Dig a reservoir next to the well drilling machine, put the water inlet of the pump directly in the pool, and use circulating water when working.
5. When drilling, the safety cover is opened, the drill bit and the drill pipe are connected to the main engine, and the wire rope is kept in a slack state. No matter whether each rod is drilled to the bottom, the main engine part falls to the bottom. When changing the rod, lift it up again and close the safety cover. Well, let the joint head be 5 cm above the safety cover, and rewind the wire at this position.
6. When drilling down two to three drill pipes, make sure whether the water pump is blocked by mud, and keep the water pump running smoothly, so as not to block the drill bit or the mud can not rush up, causing difficulty in lifting the rod.
7. During drilling, if it is necessary to rewind the wire, first stop the reversing switch to the middle position, and wait until the speed of the drilling rig stops before rewinding the wire.
8. In the process of transportation, it can be installed separately, be careful not to damage the parts, and not to be exposed to rain or water.
. Mastering the water layer
When the drilling rig is about to drill to the required depth, it should be noted that the water is washed with large grains of sand or mud, like water-white mud eggs, irregularly rounded and somewhat smooth, all of which are water layers. so far.
.Equipment maintenance
Whether the gear box of the drilling rig and the reduction box of the lifting rod are short of oil, every time the well is drilled and completed, the water pump, drill bit and joint head should be flushed, and the joint head, V-belt, wire rope, etc. should be checked frequently for damage or replaced in time. We are not responsible for any accident caused by improper operation, please use it carefully. Please contact us if you have any details.


Major equipment300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig

What we offer:
1) Good quality control
2) Highly competitive prices
3) state-of-art technology products
4)Our well drilling rig sales in China, China's Big well drilling rig manufacturer
5) Smooth communication

-COMPANY BRIEF-
We provide high-quality and complete drilling equipment including drilling rigs, drilling tools, mud pumps, DTH drilling tools, rock drilling tools, etc. They are widely used in water wells, farmland irrigation, geological exploration, small pile holes, geothermal, rope coring, Mining etc. Our products are the products of choice for drilling engineers in many countries due to their precise design and efficient drilling in use.
300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig


 

Main product

300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig

Application

Borehole drilling, Civil Infrastructure, civil engineering, and infrastructure, for rock core drilling, Soil Testing and sampling, geophysical survey companies, Pile foundation drilling, bridge drilling, wind power generation, large-mouth engineering drilling, oil field, metallurgy, mining, geological mineral exploration, water conservancy and hydropower construction, coal mine, mine tunnel drilling, grouting reinforcement engineering, highway, subway, high-speed rail, concrete core sampling, etc, Coring exploration, drilling.
300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig
Workshop
Why we achive today′s achievements is because we are supported and assisted by a highly experienced team of designers and engineers that enable us to complete all the assigned projects successfully as per the specified requirement from our clients. Guangzhou International Technology  Co.,Ltd. will continue committing to provide low cost Rock Drills, Drilling tools, well drilling rigs, high efficiency drilling tools, energy saving and environmental product for domestic and international clients.
300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig

-WHY CHOOSE US-

--The first-class engineers of tricone bits and PDC bits
--Advanced technology and Equipment, International standard.
--R&D center for rock drilling tools, high precision CNC machines, SGS&ISO Certified.
--10+ Years & 40+ Countries of service experience.
--Optimized solutions for the various requirements.

DIY customization: please provide your rock formation information or detailed size drawings.

Free samples: some samples can be provided free of charge.

Payment: T/T L/C, D/A, D/P, Western Union, MoneyGram.
 

Packaging
Wood Box
Fumigation Tray if necessary
Other special packages can be applied
according to the customers' need
Delivery
Prepared to deliver within 1 week, if in stock
Depends on order quantity, when out of stock
Transportation:By sea or air

 

Purchase process

300m Borehole Drilling Diesel Hydraulic Crawler Waterwell Drilling Rig


 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now